To such problems,the gen-eral relationships between the additional cost and the reduced duration are described,a multiobjective programming is presented in the activities such th.
本文旨在对于GERT网络中时间—费用为非线性关系时,阐述了追加费用与缩短作业时间的一般性关系,进而建立了一个多目标数学规划模型。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号