Application of Project Management in Phase of Checking before Acceptance in the Property Management;
项目管理方法在物业接管验收中的应用研究
Primary Analysis For BAS Reception, Examination and Operation Management in Hospital
浅析医院建筑设备自动化系统接管验收及运行管理
acceptance test
验收试验;验收试验;接机考验;接收测试;接收试验
Standard for welding and acceptance of steel pipings and pipelines
钢质管道焊接及验收标准
Delivery requirements of malleable cast iron pipe fittings
GB/T3288-1982可锻铸铁管路连接件验收规则
Specification for construction and acceptance of wire pipelines with fastening connection steel conduit
套接紧定式钢导管电线管路施工及验收规程
Code for construction and acceptance of welding works of on-site equipment and industrial pipeline
现场设备、工业管道焊接工程施工及验收规范
Key Items and Effect Factors of Inspection and Acceptance for Premium Connection Tubing and Casing
特殊螺纹接头油 套管验收关键项目及影响因素
Comparison among Radiographic Inspection and Acceptance Standards for Butt Welds in City Gas Steel Pipes
城镇燃气钢管对接焊缝射线检测验收标准比较
Receive Location '{0}' has no receive pipeline. Specify a Receive Pipeline.
接收位置“{0}”没有接收管道。请指定一个接收管道。
Code for construction and acceptance of wire pipelines with extruded connection thin wall steel conduit
套接扣压式薄壁钢导管电线管路施工及验收规范
Specification for welding and acceptance of reinforcing stell bars
钢筋焊接及验收规程
MIRR (Materials Inspection and Receiving Report)
材料检验与接收报告
AGREE (Advanced Ground Receiving Equipment Experiment)
高级地面接收设备试验
Anticipated date of taking over of the project
预计工程验收交接日期
uipment acceptance requirements and inspections
设备接收的要求与检验
experimental radio receiver
实验型无线电接收机
The Problems and Counter-measures in the Taking and Acceptance of Real-estate Management Project;
前期物业管理中物业项目承接验收的问题与对策
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号