After Indrawati Ⅲ hydropower station in Nepal entered into commercial operation, It is found that 3 units of turbine generating sets can not reach the rated output of 3×2.
尼泊尔印德拉瓦迪—Ⅲ号水电站投入运行后发现 ,在上游水位达到设计水位时 ,三台机组不能同时达到额定出力 (即 3× 2 。
And the rated output of generator would be increased from 100 MW to 114 MW under the condition that rated speed, rated voltage and rated power factor were not changed.
在额定转速、额定电压和额定功率因数不变的条件下 ,发电机的额定出力由原来的 10 0MW提高至 114MW。