This paper presents the methods and results for selection of normal storage level,dead water level,installed capacity and unit type for Suzhi hydropower project,and analyses the benefits of the project.
介绍了苏只水电站工程正常蓄水位、死水位、装机容量、机组机型等比较选择方法和选择结果,并分析了工程效益。
In Shuoduogang hydropower cascade development project,Xiaozhongdian is the headwater regulating reservoir,the comprehensive analysis of its benefit of power generation,compensative benefit for lower reach,reservoir inundation,economic comparison is described,from this,the suitable normal pool level of the reservoir is selected.
从电站发电效益、对下游梯级的补偿效益、水库淹没、经济比较等方面进行综合分析,提出合理的正常蓄水位。
From physical model test,two important indexes of Cuijiaying Hydro-junction Project,the normal pool level and the maximum navigable discharge,are obtained.
通过模型试验研究,得出了崔家营航电枢纽运行中的2个重要指标(正常蓄水位、最高通航流量)。
As the project construction is progressing to full scale, the implementation of 400 m (normal pool level) scheme with one-stage completion becomes more important and imminent.
2003年11月龙滩工程将实现大江截流,随着工程建设的全面推进,越发显出实施龙滩水电站正常蓄水位400m一次建成方案的重要性和紧迫性。
Application of information entropy fuzzy matter-element method in decision of normal high water level of reservoirs;
熵模糊物元分析法在水库正常高水位决策中的应用
The paper states the control factor for determining the elevation of waterside pavilion of river course ─ the calculation method and course of normal high water level.
该文阐述了确定河道人行亲水平台高程的控制因素——正常高水位线的计算方法及过程,结合分析河道已建壅水建筑物对正常高水位线的影响,提出了确定人行平台高程应遵循的原则并介绍一种简便的校核计算正常高水位线的方法。
Comprehensive Evaluation and Reasearch of Normal Water Level Project about Reservoir;
水库正常蓄水位方案综合评价及研究
Full Supply Level Demonstration Process and Considerations of Gelantan Hydropower Station
戈兰滩水电站正常蓄水位论证过程与体会
Application of a Multi-layer Fuzzy Comprehensive Evaluation Method on the Choice of Normal Water Level;
多层次模糊优选方法在水库正常蓄水位选择中的应用
Implementing the 400-m scheme with one-stage completion and bringing the huge benefits of the Longtan Project into full play;
龙滩工程按正常蓄水位400m方案一次建成效益巨大
normal high water level
正常高潮位正常高水位
An abnormal accumulation of serous fluid in the abdominal cavity.
腹水腹腔中浆液的不正常积蓄
Estimation of Influence on Jingnan Power Station by Normal Impoundment of Wangcun Power Station
旺村电站正常蓄水后对京南电站影响预测
So thehorizontal displacements of a dam are normal as a whole.
因此,大坝水平位移变化总体上正常。
A horizontal dislocation, as of a rock stratum, at a fault.
水平断层不正常的岩层水平变位或断错
The battery 's quite low, and needs some distilled water .
蓄电池水位相当低了,需要加些蒸馏水。
Edema tends to appear first where tissue turgor is normally lowest.
水肿首先表现在正常时充盈度最低的部位。
Water that infiltrates the soil and is located in underground reservoirs called aquifers.
浇灌渗入土壤且位于地下水库或蓄水层之水体。
Provides automatic filling of elevated tanks or reservoirs.
具有自动注水提升容器或蓄水池水位的功能。
V. Deliberate Distortion of Normal Scientific, Technological, Economic and Trade Exchanges
五、对正常的科技和经贸交流活动进行蓄意歪曲
Maintaining the Stability of Production by Unclogging Regenerator
有效疏通受堵蓄热室 确保生产正常稳定
for indicating the level of water in e.g. a tank or boiler or reservoir.
在罐或锅炉或蓄水池里的测量水位的仪器。
Analysis of Engineering Benefit of Hongze Lake Raising Water Level of Sluice;
南水北调东线洪泽湖抬高蓄水位工程效益分析
NUMERICAL SIMULATION OF TOTAL DISPLACEMENT FIELD CHANGE AFTER IMPOUNDMENT OF THREE GORGES RESERVOIR
三峡水库蓄水后全位移场变化的数值模拟
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号