The resource share of the main substation is one of the hot topics in recent years, but the sham resource share should be avoided.
论述主变电所资源共享的问题,认为应避免电力资源“假共享”的现象。
The 110 kV main substation resources are usually shared by two urban rail lines in Shanghai.
介绍了由2条城市轨道交通线共用1座110 kV主变电所实现资源共享的工程实例。
On the main wiring of mine ground substation;
浅析矿山地面变电所的主接线
Hotline work technology on substation secondary system;
变电所二次系统带电作业技术
How to Make the Safety and Standardization of Management for the Substations More Perfect;
如何做好变电所的安全管理和规范管理工作
Optimal construction of secondary wiring of transformer station;
变电所二次接线优化施工
The battery is maintenance-free and realizes the operation of transformer stations without operator watch.
它具有比镉镍电池更优越的特性,能做到免维护,使变电所无人值班成为现实。
First, the paper gives an introduction about the development of direct current power supply system in railway transformer substation.
介绍了铁路变配电所直流电源系统的发展,对组成系统的主要部件即蓄电池、充电浮充电机及控制系统进行了分析,阐述了直流电源系统选择的实质及容量的确定,建议一般铁路变配电所宜选用带镉镍蓄电池或免维护全密封铅酸蓄电池的自控型直流电源成套装置,建议将建立"三遥"(遥控、遥测、遥信)电力系统的变配电所直流电源系统选用全自动智能型带有"三遥"接口的直流电源屏。
Summary: Current change to go together with the extension that transformer substation with set up transformer substation start construction to have a dissimilarity,demand the side circulate side construction,install difficulty big,the safe problem is outstanding and adjust to try process complications.
既有变配电所改扩建与新建变配电所施工有所不同,需要边运行边施工,安装难度大、安全问题突出、调试过程复杂。
Application Research on Static Var Compensating Device in Metro Main Transformer Station
动态无功补偿装置在地铁主变电所的应用研究
The resource share of the main substation is one of the hot topics m recent years, but the sham resource share should be avoided.
论述主变电所资源共享的问题,认为应避免电力资源“假共享”的现象。
Operation Ways Analysis of a Substation that Has 3 Major 110kV Generator Transformers
含有3台主变的110kV变电所备自投运行方式分析
Analysis on Bus-bar Automatic Transfer Switch Logic of Inner-bridge Connection with One Transformer
完整内桥接线单主变变电所备自投逻辑剖析
Measures of protection relay on reducing the damage of main transformer caused by medium-voltage and low- voltage busbar fault
降低变电所低压侧母线故障对主变损害的继电保护措施
Study on Main Equipments On-Line Monitoring Information System for Traction Power Substation;
牵引变电所主设备在线监测信息系统的研究
Reliability Analysis of Traction Substation Main Wiring of Passenger Dedicated Railway
客运专线牵引变电所主接线可靠性分析
Its downholc discharge apparatus are made up of rectification frequency converter, discharger and cable.
其井下放电设备主要是由整流变频器、电仪与电缆所组成。
The reliability criterion of bus arrangement systems is power supply continuity.
变电所电气主接线可靠性判据应该是:供电连续性。
This third stage is the one that represents the real transforrnation and the major payoff.
这第三阶段代表了电子商务所带来的真正的变革以及主要的回报。
proceeds from sale of unclaimed goods
变卖无主货物所得款
Research of Automatic Throw-in Equipment of Emergency Power Supply of Heihe 220kV Substation
220kV黑河变电所所变电源备自投方案的研究
Design of primary circuit typical diagram for 110 kV substation of wind farm
风电场110kV变电所电气一次标准图设计
Optimized Location of 220kV Danfen Substadtion in Qujing Yunnan Province
曲靖220kV丹凤变电所所址优化
The state variables to be fed back are output voltage and capacitor current.
状态反馈所需的变量为电容电压和电容电流。
On Relay Protection Test Software of Traction Substations
牵引变电所继电保护测试软件研究
Code for fire protection design of power plant and substation
火力发电厂与变电所设计防火规范
If the electric field added is unchangeable, what produces is the direct current.
如果所加的电场不变,产生的是直流电。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号