Based on optimized design of main power block configuration and structural sizes for Datang Xinyang 2×600 MW USC units project,phase II,the paper analyzes and compares the affects of different arrangement schemes on the primary investment,operation and maintenance.
通过对大唐信阳二期2×600 MW级超超临界机组工程主厂房布置格局、结构尺寸的优化设计,分析比较了不同布置方案对初投资、运行维护的影响。
Analysis of the factors that affect the arrangement of powerhouse of pumped storage power station
抽水蓄能电站厂房布置的影响因素分析
Discussion on Main Building Layout of 1000MW Ultra Super Critical Unit
1000MW超超临界机组主厂房布置格局探讨
Main Building Arrangement of Guodian Huozhou Supercritical Air-cooling Unites
国电霍州超临界空冷机组工程主厂房布置
Design Optimizations for Conventional Island for Ling'Ao Phase II Nuclear Power Plant
岭澳核电站二期工程常规岛主厂房布置设计优化
Experience in designing main power building adopting "braced frames" system--structural arrangement
钢结构主厂房采用“支撑框架”体系的设计体验——结构布置
proposal of the Plant I layout
1号厂房工艺布置方案图
Study on Water Seal Layout at the Power House Monolith Joint of Power Station in River Channel;
河床式水电站厂房坝段横缝止水布置形式研究
Scheme of Seepage Control of Underground Powerhouse of Lianghekou Hydropower Station
两河口水电站地下厂房渗流控制布置方案研究
Analysis of the factors that affect the arrangement of powerhouse of pumped storage power station
抽水蓄能电站厂房布置的影响因素分析
Study on the Water Seal Layout at the Bulb Tubular Powe Station
灯泡贯流式水电站厂房水平止水布置研究
Discussion on layout of temperature slots of the main power building longitudinal frame with 1000MW units
1000MW机组主厂房结构纵向温度伸缩缝设置的探讨
Layout of Underground Powerhouse Complex and Support Design of Surrounding Rocks around the Group of Underground Chambers atDackaoshan Bydropower Station
大朝山水电站地下厂房枢纽布置和地下洞室群围岩支护设计
Analysis and Optimization of Underground Power House Arrangement of Xiabandi Key Water-Control Project, Xinjiang
新疆下坂地水利枢纽工程地下厂房布置的分析与优化
The room is artistically decorated.
房间布置得很美观。
The room is in reasonably good order.
这房间布置得井井有条。
She reorganized the room.
她重新布置了房间。
The room was beautifully decorated.
房间布置得很漂亮。
How are you going to furnish the house ?
你将如何布置房子?
Technical specification for load design of main building in fossil fuel power plants
火力发电厂主厂房载荷设计技术规程
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号