The power station bus systems arrangement is the main part of power systems .
本论文首先介绍了发电厂主接线可靠性的定义、性质以及主接线可靠性研究的重要性。
Main Connection Reliability Analysis of Power Plant Base on FD Method
基于FD法发电厂主接线可靠性分析
RESEARCH AND PRACTICE ON RELIABILITY EVALUATION OF POWER STATION BUS SYSTEMS ARRANGEMENT;
发电厂电气主接线可靠性研究与实践
Study of Reliability Evaluation for Bus Configurations of Power Station and Substation;
发电厂、变电站电气主接线可靠性评估的研究
Auxiliary Scheme of Thermal Power Plant
火力发电厂的厂用电接线
Connection Mode of HV Service Power Supply for Power Generation Enterprise and Its Economic Benefit;
发电企业高压厂用电源接线方式与经济效益
Main electrical connection upgrade design of Jinjitan HPP
隆安县金鸡滩电厂一次主接线改造设计
Analysis and Treatment of the Multi-point Earthing Breadown in the the 3# Transformer core in Qiaotou Thermal Power plant
桥头发电厂 #3 主变铁芯多点接地故障的分析与处理
Technical specification for load design of main building in fossil fuel power plants
火力发电厂主厂房载荷设计技术规程
Electric utilities and industrial plants are the principal producers.
发电厂和工厂是硫氧化物的主要来源。
Structural analysis of wind turbine main shaft using nonlinear contact method
风力发电机主轴的非线性接触有限元分析
Research of fault diagnosis of grounding grid of electric power plants and substations
发电厂、变电站接地网故障诊断研究
a power, chemical plant
发电厂、 化工厂.
Research on 220 kV Buses Association Plan for Erdaojing Power Plant on Old and Increased Equipments
二道江发电厂新、老厂220kV母线环并方案研究
radio receiver or transmitter
无线电接收机或发射机.
a radio receiver, transmitter
无线电接收机、 发射机.
d transmitting installation
无线电接收发送装置
The workers took control of the factory in order to pre-empt its sale by the owners.
工人们先发制人接管了工厂以阻止厂主将工厂出售.
Grounding design guide for hydropower station
水力发电厂接地设计技术导则
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号