Based on a large-scale model test on foundation engineering combined with rigidity variation design for balance settlement and interaction between the side and toe resistance of pile, the paper introduces the plan designing, the model components manufacturing, the fixing for test components, the data collecting and so on in the model test.
结合变刚度调平设计和桩侧阻端阻相互作用大型地基基础模型试验,介绍了试验中的试验方案设计、模型构件制作、测试元件置安以及试验数据采集等内容,强调了试验方法和过程控制的重要性,并对试验中出现的问题进行了探讨。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号