Design and construction of a temporary trestle bridge spanning a deep foundation pit in Changping pump station storage pool project;
昌平泵站调蓄池工程大型深基坑临时栈桥的设计与施工
Research purposes:The inverted arch trestle bridge program was applied in constructions of many ttmnels,but the results were not very perfect.
研究目的:仰拱栈桥方案在很多隧道施工中都应用过,但往往不太理想,特别是客运专线上马后对仰拱混凝土施工又提出了更高的要求。
The design and calculation of trestle of Lingjiang grand bridge;
灵江特大桥栈桥设计与计算
Building & Repairing History and Durability Status of a Trestle;
某栈桥的建造、维修历史及其耐久性状况
Design of 13m Large Cantilever Structure for Sampling Trestle in Lingao Nuclear Power Station;
岭澳核电站废液取样栈桥13m大悬臂结构设计
The stress of the approach bridge was gotten through field loading experiment,and the maximum stress of members of the approach was obtained by ANSYS finite element calculation software.
通过现场加载试验测得栈桥的应力,并利用ANSYS有限元计算软件计算出栈桥各构件的最大应力。
In connection with the steel beam engineering of the landing stage of Railway Yantai-Dalian,the key technique in the fabrication process is summarized in this paper to provide reference for the similar projects later.
文章结合烟大铁路轮渡栈桥钢梁工程实例,对栈桥钢梁制造过程中的一些关键技术进行了总结,为今后类似工程的施工提供了借鉴。
This article offers some measures for ensuring a safe loading of landing stages after testing and analyzing the dynamic and static stress of a sample landing stage.
通过对一实际钢栈桥动、静态应力的测试和分析,提出了保证栈桥安全承载的措施。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号