In the first phase of Shenzhen metro construction,there are two 110 kV main substations with the same equipment configuration.
深圳地铁一期工程包括两座110kV主变电站,两站设备配置类似。
Based on the planning of Shanghai rail transit network and the city s power supply system, this paper proposes that the resources of the main substation of rail transit shall be shared by more rail lines.
针对城市轨道交通网络的发展规划,结合城市电网的发展,从提高轨道线路供电可靠性和电力资源利用率的角度出发,提出轨道交通供电系统主变电站资源共享的建设模式。
As increasingly constraint of urban construction lands,to build main substation of urban rail transit(URT) under the ground should be a excellent solution,Based on the working experience for years,a new solution is raised in this paper,which would solve the difficulty in the construction of main substation.
随着城市建设用地的日趋紧张,城市轨道交通的主变电站设置在地下将会是一种很好的解决方案。
By discussing saving electricity items such as electric substation main transformer reformation,road lamp saving energy reformation,improving circuit power rate,reducing source consuming in some enterprise in detail,some experimental method during construction process was provided.
通过对某企业开展的变电站主变改造、路灯节能改造、提高线路力率、降低能源消耗等节电项目进行详细论述,提出了实施过程中的一些经验做法,实践证明,经过这些节电项目的实施,节能效果显著。
Reliability evaluation of substation bus arrangements based on FD methods;
基于FD法的变电站主接线可靠性评估
The String Configuration Rule and Strategy in 500kV Station of Henan Power Grid
河南电网500kV变电站主接线配串策略研究
Study on Tranmission Network Reliability Considering the Impact of Substation Bus Arrngement;
计及变电站主接线影响的输电网供电可靠性研究
Operational analysis of the main connection of 220kV section in the 500kV substation
500kV变电站220kV侧主接线运行分析
Study of Reliability Evaluation for Bus Configurations of Power Station and Substation;
发电厂、变电站电气主接线可靠性评估的研究
Research for Reliability Analysis of Bus Arrangement on 750kV Station;
750kV变电站电气主接线的可靠性分析研究
Study of Synthetical Assessment System in Distribution Substation Main Electric Connection;
变电站电气主接线综合评价系统的研究
Reliability and Economic Evaluation of the Bus Configuration of the Substation;
变电站电气主接线可靠性与经济性评估
Discussion about Switching Operation of Conection Mode of 3/2 of 500 kV Kilovolt Substation
500kV变电站3/2断路器主接线倒闸操作的探讨
Wiring modes of main substations for urban mass transit and their harmonic influences
城市轨道交通供电主变电站接线模式分析及其谐波影响的研究
Application of back-up switching equipments with the new function of closing or opening loops in 110 kV inner-bridge-connected substations
增加合解环功能的备自投在110kV内桥式主接线变电站中的应用
Application of back-up switching equipments in 110 kV enlarged external bridge and 10 kV single busbar with Ⅳ segments connection substation
备自投组在110kV扩大外桥和10kV单母Ⅳ分段主接线变电站中的应用
Operation mode adjustment of atypical 220 kV substation station power using system connection mode
220kV变电站非典型站用电接线的运方调整
Safe Operation Analysis on 110kV Transformer Substation with Internal Bridge Connetion
110kV内桥接线变电站的安全运行分析
Discussion on the Connection of Shunt Reactor in the Substation Supplied with Long Power Cables
长电缆供电变电站并联电抗器接线方式探讨
Discussion on 3/2 connection T wiring short-lead zone protection scheme in 500 kV substation
500kV变电站3/2接线T区短引线保护方案探讨
Solutions for Four-section Single Bus Configuration Problem in Installment Construction of Substation
变电站分期建设中单母线四分段接线问题解决
Usually, there is no interconnection between the circuits energized by the various substations.
通常,由不同变电站送电的线路之间无相互联接。
Problem is also encountered in connections between underground lines and substations.
地下电缆线路与变电站联接时还会碰到问题。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号