A multiple-phase optimization method for IT project planning is presented to meet the uncertainty of IT project process and dynamic of project resources.
本文针对IT项目实施过程的不确定性和项目资源的动态性,提出了一种基于分阶段求优的IT项目进度计划方法。
This paper briefly expounds the causes of the generation of the income tax accounting, points out that the separation of the accounting profit and the taxable profit generates the permanent difference and the temporary difference, and probes into the accounting treatment methods for the permanent difference and the temporary difference.
简述了所得税会计产生的原因,指出会计利润与应税利润的分离产生了永久性差异和时间性差异,并对永久性差异与时间性差异的会计处理方法进行了初步探讨。
IT Project Planning Based on Multiple-phase Optimization;
基于分阶段求优的IT项目进度计划方法
IT Project Planning Method Based on Markov Decision Process;
基于马尔可夫决策过程的IT项目进度计划方法
A Technology Based on Critical Chain for Project Scheduling;
一种基于关键链的项目进度计划方法
Study on the Method of Data Warehouse Project Schedule Development;
数据仓库项目进度计划编制方法研究
Critical chain -- A new method for project planning and scheduling;
关键链——一种项目计划与调度新方法
Research on the Method of Task Decomposition and Critical Chain Scheduling for Collaborative Manufacturing;
协作制造项目任务分解与关键链进度计划方法研究
There is a comparative method of Gantt chart among progress-actual vs schemed method which is applied to construction progress control management.
在工程项目进度控制管理中,有一种实际进度与计划进度比较的方法是横道图比较法.
Research on the Making Construction Project Schedule with Critical Chain Method
工程项目进度计划编制的关键链法研究
Fuzzy dynamic programming method for progress adjustment of project mangement;
项目管理中进度调整的模糊动态规划方法
Set up active plan according to project target and schedule.
根据项目目标及进度制定行动计划.
Plan and Control of Schedule in Telecommunication Design Project
通信工程设计项目的进度计划与控制
Software Project Schedule Estimation Based on Three Methods Integration
基于三法融合的软件项目进度估计方法研究
Applying Gantt Charts on project scheduling, implementation plan is put forward.
用甘特图进行项目的进度安排,提出了实施计划方案;
(13) the progress plan for the construction of the project; and
(十三)项目实施的进度计划;
A Research on Schedule Plan and Control of Software Development Project;
软件开发项目的进度计划与控制研究
618B04 Fetal Monitor Project Schedule Management Plan Study
618B04胎儿监护仪项目进度管理计划研究
Progress of Project Based on Colored Petri Nets
基于着色Petri网的项目进度计划
To implement the efficient and result-orientated method (project schedule, cost) in daily work.
在日常工作中使用有助于提高工作效率和效果的方法(如项目进度计划、成本控制)。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号