This paper proposes three economic principles of cost allocation: completeness, rationality, and marginality.
提出了费用分配的三个经济性原则,在这些原则的基础上建立了公用设施费用分配问题的数学模型。
In this article we consider the cost allocation problem that is closely related to the facility location problem and present an improved approximation algorithm for it.
论文研究了与设施选址问题密切相关的费用分配问题,并利用原始与对偶线性规划的思想和无容量设施选址问题的一个1。
On the cost management under the contract of FIDIC;
谈FIDIC合同条件下的费用管理
Cost management in engineering projects is one of main content, construction and installation costs in engineering projects are more than half of total costs and also the most active part of engineering construction costs.
工程项目费用管理是项目管理的主要内容之一,而建筑安装工程费在工程项目费用总投资中占有一半以上的份额,又是工程建设中最活跃的部分。
Construction project expense management based on contractual relationships;
基于合约事务的工程项目费用管理
The system was designed using the method given by the FIDIC(Fédération Internationale des Ingénieurs-Conseils) using expense management concepts.
为使工程项目信息管理系统在企业运作上更具有指导、预测、控制的效能,开发了以费用管理与算法为基础的工程综合信息管理系统。
Particular emphasis is laid on the presentation of owners expense management and project claims under FIDIC terms.
侧重介绍了FIDIC条款下业主的费用管理及费用索赔,从监理单位的角度提出了在FIDIC条款下如何协助业主应对费用索赔的相关措施及策略。
allocation of general administration
一般行政费用分配数
standard over head rate
标准制造费用分配率
Cost Budgeting- allocating the overall cost estimate to individual work items.
费用预算-总费用分配到单个工作项目上。
3 Cost Budgeting-allocating the overall cost estimate to individual work items.
费用预算-将总费用分配到单个工作项目上。
service department allocated cost variance
辅助部门费用摊配差异;辅助生产部门费用分配差异
allocation of other internal services
其他内部事务费用分配数
machine hours basis of overhead application
制造费用分配的机器小时法
Study on Transmission Charge Allocation in Power Markets;
电力市场中的输电费用分配方法研究
The overhead rate can be expressed as a percent-age or an hourly rate.
间接费用分配率可以用百分比或小时费率来表示。
summary of cost of manufacturing expenses applied
己分配制造费用汇总表
under-applied factory overhead
少分配工厂制造费用
applied factory overhead expense
已分配工厂间接费用
applied selling and administrative expenses
已分配销售及管理费用
applied material handling expenses
已分配材料管理费用
extraordinary costs not allocable to programmes
不能分配于各项方案的特别费用
applied manufacturing overhead account
已分配间接制造费用帐户
Cost be apportion according to plan revenue
根据计划好的收入分配费用
Cost is apportion according to plan revenue.
根据计划好的收入分配费用。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号