Stringent examination of final accounting of highway infrastructure project completion;
交通基本建设项目竣工决算审查
Issues in need of special attention during construction organization design and construction scheme examination;
施工组织设计及施工方案审查中应注意的问题
Research on highway cost examination methods;
公路工程造价审查方法研究
Overall inspection in Distance Education Support System;
远程教育支持系统开发过程中的综合审查
inspection over safety techniques, supervision at the preparatory stage before construction, supervision at the main structure construction stage, supervision at the stage of decoration, and superv.
文章从安全技术措施的审查、开工前施工准备阶段的安全监理、主体施工阶段的安全监理、装饰装修阶段的安全监理、季节性施工的安全监理等几个方面论述了监理工程师如何搞好建筑工程的安全监理工作。
The paper analyzes a few problems disputed in construction drawing inspection in residence building,clarifies whether inspector or designer must apply code,should deal with concrete matters related to work.
通过对住宅施工图审查中有争议的几个问题进行分析,阐明了无论是审查者还是设计者都须执行现行规范,应该本着求实和务实的态度审查住宅施工图。
On the regimentation and audit of budget needed for the complement of the freeway;
关于高速公路竣工决算编制审查的探讨
About the architectural construction blueprint audit meaning;
浅谈建筑施工图审查的意义
Author points out that the audit of design should be strengthened as well as correct preparation of budget estimate,introduction of competition mechanism and carrying out cost limited design to realize reasonable control of engineering cost.
阐述了造价控制以设计阶段为重点的理论意义,并从四个方面分析了在设计阶段进行工程造价控制的主要原因,提出了实现设计阶段控制造价的具体方法,指出应加强对设计的审查,准确编制概、预算,引入竞争机制,实行设计招标,推行限额设计,以使工程造价控制在合理的范围内。
Review Principle of Legality on the Specific Administrative in China;
论我国具体行政行为合法性审查原则
Principles and requirements of the review of technical evidence in the prosecution phase;
起诉阶段技术性证据审查的原则和要求
Earnestly familiarity with drawing paper, seriously investigation into drawing paper;
认真熟悉图纸 搞好图纸审查
Common problems in the investigation of highway project pricing and preventive measures on it;
公路工程造价审查中的常见问题及预防措施
The text expounds the important contents and ways of the investigation to the additional project cost, which includes, modification of the design, on-site visa, technical measure, material reqlace ment and exceed project of the contract.
从设计变更、现场签证、技术措施、材料代用、合同外追加部分几个方面详细阐述了工程变更价款审查的重点内容和方法。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号