Single machine group scheduling with resources dependent setup time;
安装时间受资源约束的单机成组调度问题
The objective function is to minimize total resource consumption of setup time and jobs under makespan constrains.
讨论了安装时间和加工时间同时受资源约束的单机成组排序问题。
In this model, the setup time of a group is a strictly decreasing function of the amount of resources consumed, and the processing time of a job is a strictly increasing linear function of its starting time.
在这一模型中,工件组的安装时间是所消耗资源的非负严格减少连续函数,工件的加工时间是开工时间的严格增加函数。
Single machine group scheduling problem with setup times;
一类带有安装时间的单机成组排序问题
With three dimensional finite element method, the author analysed and calculated the stress of the dam section with erecting bay in the Zuojiang water resources pivotal project.
利用三维有限元法分析计算了左江水利枢纽安装间坝段的应力。
An On-line Parallel-machine Batching and Scheduling Problem with Batching Setups
一类带批安装时间的平行机在线分批排序问题
The installation of the reactor will take two months.
安装这个反应堆需要两个月的时间。
The Installation of the shower only take a few minute
安装淋浴器只花了几分钟时间
The installation of the shower only took a few minutes.
安装淋浴器只花了几分钟时间。
How long will the connection of the telephone take? ie How long will it take to install a telephone and connect it to the exchange?
安装电话机与总机接通要多长时间?
It took us half an hour to fit up the apparatus
安装这台仪器花了我们大约半个小时的时间。
To complete installation at another time, please run setup again.
如果要另选时间来完成安装,请重新运行安装程序。
Please wait while Setup installs the components. This may take several minutes.
请稍候,安装程序在安装组件。可能要花几分钟的时间。
Setup is loading installation components. This may take a minute or two.
安装程序正在加载安装组件,这可能需要1-2分钟的时间。
"Setup cannot find a locally attached hard drive with enough space to hold the temporary Setup files.
"安装程序找不到能够容纳临时安装文件的空间充足的本地硬盘。
Please wait while Setup installs language files. This might take a few minutes.
安装程序正在安装语言文件,请稍候。这可能要花几分钟的时间。
machine could be susceptible to viruses between installing the components and
那么在安装组件和应用最新的安全更新之间的这段时间里,
Card reader with time and attendance. Mount type can be specified.
可记录时间和出勤的刷卡器。可指定安装类型。
Installs tools and add-ins used to optimize your design and development time
安装可优化设计和开发时间的工具和外接程序
In the past it took phone companies one to three weeks to install T1 service.
过去安装t1服务电话公司要用1~3周的时间。
All this electrical wiring will take a day to set up.
所有这些电线架线要花一天时间安装好。
Analysis of Spatial State for Temporary False Work of Steel Box Girder During Large Segmental Installation
钢箱梁大节段安装临时支架空间状态分析
Setup cannot create a temporary directory. You may not have enough disk space. Free some disk space and try running Setup again.
安装程序无法创建临时目录。可能由于磁盘空间不够。请释放部分磁盘空间,再运行安装程序。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号