The determinant factor of mine scale is analysed,and the math.
本文分析了矿山规模的决定因素,提出了矿山规模与矿山设备生产能力的数学模型,研究了如何以最少的设备实现矿山的设计规模和矿山设备数量一定时,如何组合采装运设备以实现最大的生产规模,最后给出了一个实际算例。
This paper addresses the methodology of introducing risk into the development of mine plans for open pit mines.
本文介绍了在露天矿山规划的制定中引入风险的方法论。
Special rules of mine engineering scheme comparison;
矿山工程方案比选的特殊规律
Pattern recognition principle of 3-D seismic exploration and its applying effect on mine engineering fissure zone;
矿山工程裂隙破碎带的三维地震模式识别原理及应用效果
On how to serve as a designer in chief for mine projects;
如何当好矿山工程项目的总设计师
It is the foundation in optimal design that mining engineering is systemmatically understood.
矿山工程最优设计的基础是实现对矿山工程的系统认识,文中初步刻画了矿山工程的属性类及其特征谱系,简述了矿山工程的合目的性、社会性、经济性及文化特性;研究了矿山工程中的柔性、反直觉性、开闭两重性、群控制特性、组织、编码、突变、约束及旋进发展机制。
Probing into the Teaching Reform in the major of Mining Engineering and Technology;
矿山工程技术专业的教学改革与探索
Discussion on management of design qualifications for mine projects in China;
对我国矿山工程设计资质管理的探讨
Applications of 3D Visualization Technology in Mining
三维可视化技术在矿山工程中的应用
The reason of the contract issue in the mine engineering and its measures;
矿山工程施工合同纠纷产生的原因及预防
Terms relating to coal mining--Mining electrical engineering
GB/T15663.11-1995煤矿科技术语矿山电气工程
Practise External Contract of Mining Works Improve Beneficial Result of Mine;
推行采矿工程外包 提高矿山企业效益
Design and Practice of Grinding Flowsheet for Phase Ⅱ Project in Dahongshan Copper Mine
大红山铜矿二期工程磨矿流程的设计与实践
Specification for non-ferrous metal survey
有色金属矿山井巷工程测量规程
Code for design of land reclamation project of bauxite mines
铝矿山土地复垦工程设计规程
Code for construction and acceptance of mining pit engineering
矿山井巷工程施工及验收规范
Copper-gold Polymetal Metallogeny and Prospecting Systematic Engineering of East Tianshan, Xinjiang, China;
东天山铜金多金属成矿学及找矿系统工程学
Analysis of Underground Mining Project Outsourcing of Yinshan Mining Company
银山矿业公司井下采矿工程外包后情况分析
Code for shaft and drift design of non-ferrous metal nines
有色金属矿山井巷工程设计规范
FULL SCALL TEST OF FLOWSHEET OF FLOTATION OF HEMATITE AT DONG ANSHAN
东鞍山红铁矿单一浮选流程工业试验
Study on Tendering with Bill of Quantity in Mine Construction Projects;
矿山建设项目工程量清单招投标探讨
Preliminary Exploration on the Rational Pricing of Building Engineering in Mine Capital Construction;
矿山基建合理确定建筑工程造价初探
Study on Electrical Conduction Characteristic of Rock-soil Masses in Mines and Its Application to Engineering
矿山岩土体导电特性及工程应用研究
Research on Flow Optimization of the Branch Dagushan Preparation Plant
大孤山选矿厂分厂工艺流程优化研究
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号