The thermal test system of cooling stave was designed and established to put up the industrial experiment of the heat transfer for the cast steel cooling stave and ductile iron cooling stave.
设计并建造了冷却壁热态试验系统,对铸钢冷却壁和球墨铸铁冷却壁的换热效果进行了工业模拟试验。
The temperature and thermal stress fields of cast steel cooling stave are calculated by finite element method software ANSYS in blast furnace at Maanshan Iron and Steel Co.
采用通用有限元软件ANSYS计算了300 m3高炉铸钢冷却壁的温度场和应力场,数值分析铸钢冷却壁冷却水管内径、间距、壁体厚度、镶砖厚度以及冷却水流速对冷却壁热面最高温度和热应力的影响。
Three parts (84 pieces) of cast steel cooling staves are installed centrally during the intermediate relining of No.
济钢 4#高炉中修集中安装三段 (84块 )铸钢冷却壁后 ,因铸钢冷却壁冷却强度大 ,易造成炉墙结厚 ,通过采用控制合适的水流量及水温差、相应的装料制度、热制度、送风制度及上下调剂的操作制度 ,达到了高炉高效顺行又长寿的目
Structure optimization of water cooling channel of cast steel stave
高炉铸钢冷却壁冷却水管的优化研究
Simulation and analysis on stress field of copper-steel complex cooling stave
铜铸钢复合冷却壁应力场的模拟计算与分析
The Experiment Research on As-Cast High Toughness Ductile Iron Cooling Wall for Blast Furnace;
铸态高韧性球墨铸铁高炉冷却壁的试验研究
The thermal stress on the hot side of cast ironstaves and copper staves on the same condition was analyzed.
计算了铸铁冷却壁与铜冷却壁在相同条件下热面热应力。
Research on Secondary Cooling of Billet for ROKOP Continuous Casting Machine of Chuanwei Irom & Steel Group Co.;
威钢ROKOP高效方坯连铸二次冷却的研究
The Working Situation Simulation of Copper-Steel Composite Stave
铜/钢复合冷却壁的服役行为仿真研究
Application of Overlapping Cooling Stave of Jigang 1750m~3 Blast Furnace
济钢1750m~3高炉叠合式冷却壁的应用
Apply Nodulizing and Inoculating Process to Enhance Quality of Nodular Cast Iron
采用球化孕育新工艺,提高球墨铸铁冷却壁质量
Therefor, the property of the copper staves is better than that of the staves of cast iron.
因此,从热应力能引起裂纹产生角度看,铜冷却壁性能优于铸铁冷却壁。
Study of Secondary Cooling for Alloy Steel Billet Continuous Casting
合金钢方坯连铸机二次冷却制度的研究
A Study on Hot Test and Thermal Stress and Distortion of Cast Copper Staves with Buried Copper Pipes
埋纯铜管铸铜冷却壁热态试验和热应力热变形研究
Effect of cooling rate on the slab surface microstructure of microalloyed steel containing Nb and Ti
冷却速度对含铌、钛微合金钢铸坯表层组织结构的影响
BenGang No.5 BF Copper Cooling Stave Damage Cause Analysis and Processing Technology of Research
本钢五号高炉铜冷却壁破损原因分析及处理技术的研究
Countermeasures against Abnormal Temperature Rise of Cooling Stave in Taphole Area of No.7 BF of Shangguan Iron and Steel Co.,Ltd.
韶钢7号高炉铁口区域冷却壁温度异常升高的处理
Damage Reason Analysis of the Cooling Stave in Tuyere Region in Jinan Steel's 1750 m~3 BF and Its Improvement
济钢1750m~3高炉风口区冷却壁损坏原因分析及改进
The Disrepair Mechanism of Blast Furnace Cooling Stave and Design of Copper Cooling Stave
高炉冷却壁的破损机理及铜制冷却壁的设计
Cold bending of 2 200 m~3 blast furnace cooling stave pipe
2 200 m~3高炉冷却壁水管的冷弯
Numerical Simulation on Liquid-solid Two-phase Flow of Water Cooling Pipe in Blast Furnace Cooling Stave
高炉冷却壁冷却水管内液固两相流的数值模拟