A drainage borehole designed depth is 584.
永城矿区某矿排水钻孔设计孔深584。
The application of the rectifying a deviation and stabilizing technique through anchor rod static press pile and silt removal by borehole was expounded in detail.
对某6 层砖混结构房屋较为严重的倾斜问题进行了全面分析,制订了综合性纠偏加固方案,着重对锚杆静压桩和钻孔排淤纠偏加固技术的应用进行了详细阐述,纠偏加固过程平稳,纠偏效果比较理想。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号