Computer aided design of the blast-hole arrangement plan in heading tunnel;
掘进巷道炮眼布置计算机辅助设计
According to the ore nature property and actual mining condition in the mine,the problem of high powder ore ratio is solved by modifying the blasting parameter and the blast-hole arrangement,the lump ore ratio and the ore utilization ratio are increased,thus,the mining cost is reduced and economic profit of the mine is increased.
针对我矿矿石的本质特性和开采的实际情况,通过改进采面爆破参数和炮眼布置方式,解决了矿石粉矿率高的问题,有效地提高了矿石块度及煅烧矿石的利用率,降低了采矿成本,增加了企业经济效益。
The technology uses deep penetration perforation charge with high perforation density and large perforation diameter and surging perforation with greater pressure differential.
它采用高孔密大孔径深穿透射孔弹和大压差抽吸炮眼清洗技术,不仅能提高油井产能,解除近井带污染,还可以改善防砂完井效果。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号