The techniques of integral hoisting of the super steel cofferdam is adopted in No.
苏通大桥主桥6、7、8号墩的特大型钢吊箱采用整体吊装施工工艺。
The selection and integral hoisting of water tower with large capacity are also discussed.
对8度震区内800m3倒锥壳保温水塔的受力特点和抗震设计进行了比较详细的分析,提出了支承筒与水柜间先进简捷的连接方式,从而增加了水塔的有效容积,缩小了水柜直径,节省投资,并对大容积水塔的选型和整体吊装施工工艺进行了剖析和探讨。
Solutions were adopted aiming to several characteristics including accurate location of construction steel box, integral hoisting (with 190 t total weight) and difficult organization.
介绍了针对施工钢套箱准确就位、钢套箱整体吊装(总重量为190t)和施工组织难度大等特点采取的应对措施。
Method and characteristics of integral lifting of axial flow Kaplan runners;
轴流转桨式水轮机转轮整体吊装的方法和特点
On the integral lifting construction technique of the arch leaf for the concrete filled steel tube's arch
钢管混凝土拱桥拱片整体吊装施工技术
The construction technique for high altitude integral lifting of large front support point form travelers by use of simple horizontal hanger frame is introduced,through comparison of construction technique of large form travelers of two cable-stayed bridges(Chongqing Fengjie Yangtse River Bridge and Pengxi River Bridge on Chongqing Yunwan Expressway).
通过重庆奉节长江大桥及重庆云万高速公路彭溪河特大桥两座斜拉桥挂篮吊装施工的对比,主要介绍了利用简易水平吊架进行大型前支点挂篮高空整体吊装的施工技术。
This paper introduces the construction scheme adopted for the integral lifting and installation of guyed form traveler for the main girder atop pier No.
介绍忠县长江公路大桥11号墩主梁牵索挂篮采用的整体吊装施工方案。
0,the rest parts of the girder of the bridge are constructed by the front-support form travelers and the construction technology for the integral lifting and installation of the travelers is presented.
丰城剑邑大桥主桥为(55+2×165+55)m单塔双索面斜拉桥与悬臂梁桥协作体系结构,除0号块前3段梁段外,其余梁段采用前支点挂篮施工,介绍挂篮整体吊装施工工艺。
Construction technology for whole erection of large span truss;
大跨度桁架整体吊装施工技术
The rope system “double-crane and five-hoist-point-”for the whole erection of the large-scale slender R.
)柱整体吊装“双机五点吊”绳系方案的最优绳系型式、最优吊点位置、最优绳元高度 (对应最优绳长 ) ,以解决大中型火电厂的大型细长钢筋混凝土柱整体吊装问题 。
One-piece Lifting of Hatch Coaming for 53 100 DWT Bulk Carrier
53100DWT级散货船舱口围整体吊装工艺
Construction Techniques for Integral Lifting and Installation of Front-Support Form Travelers of Cable-Stayed Bridge
斜拉桥前支点挂篮整体吊装施工技术
Construction Technology of Cast-in-place Box Girder Steel Framework Integral Lifting
现浇箱梁钢筋骨架整体吊装施工技术
The technical design about complete lifting and mounting of superstructure in 53000 DWT bulk carrier
53000DWT散货船上层建筑整体吊装工艺设计
Integral Hoisting Construction Technology in the Tour Towering of Steel Structure
媒体中心钢结构观光厅整体吊装施工技术
Study on the integrating lifting technology of SYMS for 30,0000t FPSO
30万吨FPSO单点系泊系统整体吊装技术研究
Measurement of Stress and Distortion from Superstructure's One-Piece Lifting of 308000 DWT Crude Oil Carrier
308000DWT油轮上层建筑整体吊装应力变形测量分析
Finite Element Analysis on Strength of Bulk Carrier Bow Block in Integral Assembly
散货船船首总段整体吊装强度有限元分析
On the integral lifting construction technique of the arch leaf for the concrete filled steel tube's arch
钢管混凝土拱桥拱片整体吊装施工技术
Construction of Hoisting and Installation of long Span Steel Structure and Floating Technology in Qiantang Tidal Bore Zone
大跨度钢结构整体吊装与浮沉技术在强涌潮区的施工实践
Analysis on the Integrally Hoisted Construction of Large-scale Oil Refinery Coke Drum
大型炼油厂焦炭塔高空整体吊装施工技术分析探讨
STEEL BOX BEAM INTEGRAL ERECTION MAKE USE OF TRANSFORMING SUSPEND-BASKET FORMING BOMMS
利用挂篮改制成的吊梁实现钢箱梁整体安装
The Positioning System for Lifting Instruments in Container Cranes;
集装箱桥吊吊具定位系统的总体设计
Hoisting Design of the Whole-set Switch of Passenger Dedicated Rail Line 18# Turnout
客运专线18号道岔转辙器整组吊装设计
Hoisting Technique Used in Changing Inner Barrel of a Blare Stack Supported with Tower Mast
塔桅式烟囱内筒体更换吊装施工技术
Analysis on Stability of Long Span Ribbed Slab Bridge System by Direct Lifting;
大跨径肋板体系桥梁吊装稳定性研究
Steel structure lifting technique of China Mariners Museum velum body
中国航海博物馆帆体钢结构吊装技术
Lifting Construction Techniques for Big Tonnage Saddle in High Tower Suspension Bridge
高塔悬索桥大吨位鞍体吊装施工技术