Fatige damage and corrosion damage and life prediction of the leg of offshore production platform in service;
采油平台桩腿的疲劳与腐蚀损伤和寿命预测
JU-2000 jack-up drilling unit has three legs.
JU-2000自升式钻井平台有两条桩腿,建造时,每条桩腿分成7个分段建造,最下面的一个分段与桩靴相连。
PATRAN-NSTRAN,FE model of a leg is found with the loads above and the leg strength is analyzed in two different situations.
应用经验公式计算风电机组安装船风、流载荷,三维势流理论计算波浪载荷,将得到的风、浪、流环境载荷平均分配到单个桩腿。
A FEM model of the pile is constructed.
通过建立自升式平台的开孔桩腿有限元模型,对桩腿开孔时在自存和作业工况下的应力进行了计算,并对开孔后桩腿结构强度与屈曲强度进行了校核。
The jacking platform elevation via piles is impacted on the wave fluctuation.
自升式海洋平台在升降桩腿时,平台和桩腿随着波浪上下波动,当桩腿底部接近海底时,将会与海底碰撞,造成冲击,破坏海洋平台的结构。
Design and FEA of Batter Pile Joint on Pile-Wharf Structures;
桩基码头叉桩节点设计及其有限元分析
Seismic and Design of Batter Pile Joint That Fabricated by Cast-in-place and Assembling on High-Pile Wharf Structures;
高桩码头整浇装配式叉桩节点抗震性能及设计方法研究
Finite Element Analysis and Design Method Study of the Integral Casting and Fabricated Batter Pile Joint on Pile-Wharf Structures;
高桩码头整浇装配式叉桩节点有限元分析及设计方法研究
Experimental Study of Eccentric Pressing Behaviours on Pile-Pile Cap Connections
桩与桩帽连接节点偏压性能试验研究
Design and FEA of a Vertical Pile s Joint on Pile-Wharf Structures;
桩基码头直桩节点设计及其有限元分析
PROTOTYPE TEST ON THE AXIAL PULLOUT BEHAVIOR OF THE JOINT OF PRESTRESSED CONCRETE PIPE PILE AND PILE CAP
预应力混凝土管桩与桩帽连接节点轴拔性能原型试验研究
Design and Seismic Behavior of the Integral Casting and Fabricated Vertical Pile Joint on Pile-Wharf Structures;
高桩码头整浇装配式直桩节点抗震性能及设计方法研究
FEA on Seismic Behavior of Vertical Pile Joint on Pile-Wharf with the Integral Casting and Fabricated;
高桩码头整浇装配式直桩节点抗震性能有限元分析
Research on the Buffered Crossbar Switching Fabrics and Its Scheduling Algorithm;
交叉节点带缓存的Crossbar交换结构及调度算法研究
A Study of Isometric Point during the Reconstruction of Anterior Cruciate Ligament (ACL) with Three Dimensional Reconstruction Models;
MR三维重建膝关节研究前交叉韧带等距点
Research in Joint of Tube Pile and Top Beam in Bracing of Deep Foundation Pit Engineering
深基坑支护工程中管桩与圈梁连接节点研究
cross regulation
交叉调节,交互调节
Influence of ε-bound real-number comparison method on node mergence in an AVL tree
ε实数比较方法对平衡二叉树节点归并算法的影响
Histologic Three-dimensional Reconstructions of the Anterior Cruciate Ligament Tibial Insertion in Human;
国人膝关节前交叉韧带胫骨止点组织学三维重建
Arthroscopic reduction and fixation of anterior cruciate ligament(ACL) avulsion fracture from the tibia spine with suture
关节镜下丝线内固定治疗前交叉韧带胫骨棘止点撕脱骨折
Arthroscopic technique of figure-of-eight suture fixation for avulsion fracture of anterior cruciate ligament in adults:report of 24 cases
关节镜下“8字”缝线法治疗成人前交叉韧带下止点撕脱骨折24例
Fatigue Safety on Weak Connection of Arch Truss Cross Joint of Chaotianmen Yangtze River Bridge
朝天门长江大桥拱桁交叉节点弱连接的疲劳安全性
Arthroscopic suture fixation with cannulated screw and washer for bony avulsion of the posterior cruciate ligament
关节镜下治疗后交叉韧带胫骨止点撕脱性骨折近期疗效观察
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号