Receive Location '{0}' has Start Date later than the Stop Date. Change either the Start Date or the Stop Date.
接收位置“{0}”的开始日期晚于停止日期。请更改开始日期或停止日期。
The Timeline finish date must be later than the start date.
时间线完成日期必须在开始日期之后。
The ending date must be set later than the starting date.
结束日期必须要设得比开始日期晚。
Start date cannot be set later than the Finish date.
开始日期不能设置为晚于完成日期
The schedule's Start Date cannot be before it's End Date.
调度的开始日期不能早于结束日期。
The phase start date must occur on or before the end date.
项目开始日期不得晚于结束日期。
The date range fixed from date is after the to date
日期范围的固定开始日期晚于完成日期
Please enter a valid Interval start date (within the Timeline start and finish dates).
请输入有效的间隔开始日期(在时间线开始日期和完成日期范围内)。
Calendar Event report: Start date, Start time, End date, End time, Subject, Location, Label
日历事件报告: 开始日期、开始时间、结束日期、结束时间、主题、地点、标签
Cannot specify a Start Date earlier than today. Specify a different Start Date.
不能指定早于今天的开始日期。请指定一个不同的开始日期。
{You moved task ^1 of '^2' to start ^3. This is before the project start date (^4).}
{您将“^2”的任务 ^1 的开始日期移到 ^3,这位于项目开始日期(^4) 之前。}
The begin and end dates must be within the parent timeline's begin and end dates.
开始日期和结束日期必须在父时间线的开始日期和结束日期范围之内。
The end date or time is set to occur before the start date or time. Please change either the start date and time or the end date and time.
完成日期或时间应该发生在开始日期或时间之前,请修改完成日期和时间或开始日期和时间。
The start date and time are after the end date and time.
开始日期和时间在结束日期和时间之后。
The From date must be earlier than the To date for the time period that the report covers.
报告涵盖时间段的开始日期不能晚于结束日期。
Timing date each month
每月开始计时的日期:
School vacation started on July 15.
假期从七月十五日开始。
School reopens on September 1.
新学期于九月一日开始。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号