Minimizing the maximum lateness with major and minor setup times in batch processing;
成组加工中有主从调整时间的最大延迟问题
The first criterion is to minimize maximum lateness,the second criterion is to minimize makespan and the third criterion is to minimize an arbitrary regular objective function.
第一指标为最大延迟,第二指标为最大完工时间,第三指标为关于工件完工时间的任意正规函数。
A method for designing lowest-delay arbitrary length M-band cosine-modulated wavelet perfect reconstruction filter banks is deduced.
本文推导了最小延迟任意长度M带余弦调制小波滤波器组的完全重构条件。
Minimizing Maximum Lateness On Batching Machine;
最大延迟时间的极小化分批排序问题
Rescheduling for Two Agents Under a Limit on the Lateness of the Original Jobs
最大延迟限制下两个代理的重新排序(英文)
Bicriteria Scheduling with Double Due Dates to Minimize the Maximum Lateness
具有双工期的最小化最大延迟的双目标排序(英文)
Effects of Delay Probability and Maximum Velocity on the Traffic Flow
延迟概率和最大速度对交通流的影响
A WORST-CASE RESPONSE TIME ANALYSIS ALGORITHM OF MESSAGES WITH DEFERED PREEMPTION
一种基于延迟抢先的消息最大响应时间算法
The heavy show delayed the train.
火车因大雪而延迟。
The jitter (or delay jitter) determines the maximum allowed variance in the arrival of data at the destination.
抖动(匮称延迟抖动)指的是数据到达目的地所需时间的最大偏差。
A Max-entropy-based High-resolution Time Delay Estimation Method for Multi-path Signals of GPS
一种基于最大熵法的高分辨率GPS多路径信号延迟估计方法
The propagation delay will grow with increasing path length.
传输延迟也将随路径的延长而增大。
Maximum speed or data rate of a device or facility which makes no allowance for necessary delaying functions, such as checking or tabbing.
设备或装置的最大速度或最大数据速率,其中不考虑必要的延迟作用,如校验、加标记等。
Worst-case transition latency in microseconds
最坏情况的中转延迟,单位为微秒
Function of PID in Heavy Load & Large Delay
PID控制模式在大负荷大迟延中的运用
In auxiliary storage unit( i. e., magnetic disk), the maximum rotation delay time for reading/ writing a record, generally, it is the time of one revolution of the recording medium.
在辅助存储器(如磁盘),读写一个记录的最大旋转延迟时间,通常是记录表面转一圈所需的时间。
We explained to everyone that the delay is inevitable.
我们向大家解释延迟是免不了的。
Delayed 3–4 upshift (41–48 MPH)
延迟的3–4升档(大约41–48MPH)
We explain to everybody that the delay is unavoidable.
我们向大家解释延迟是不可避免的。
Further progress was delayed by deep snow.
大雪延迟了行程的下一步。
It would involve a delay of about five days in shipment to repack the goods.
改装此货将使装运期延迟大约五天。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号