The model was to forecast the break-up date of the station on the Songhua River,based on the mechanism of the break-up and the ice condition statistics of the station.
依据开河机理,结合松花江某水文站的历史资料,建立了该站开河日期预报的BP神经网络模型。
The application of this new approach in forecasting the freeze-up and break-up date of the Inner Mongolia reach of the Yello.
在分析凌汛成因影响因素的基础上,选取合适的预报因子,基于模糊优选神经网络BP模型,对黄河内蒙段封河、开河日期进行样本训练和预报方案验证。
This method is applied to forecast the freeze-up date and break-up date of the Yellow River.
本文在分析影响凌汛成因因素的基础上,选取合适的预报因子,基于模糊优选神经网络BP模型,提出冰凌预报方法,应用于黄河内蒙段封河、开河日期的预报。
I remeber one point, the data date is same as your project start date.
我想起一点,数据日期与项目开工日期是同一天。
The factory is closed until further notice.
工厂已经关闭,开工日期另行通知。
"Commencement Date"means the date upon which the Contractor receives the notice to commence issued by the Engineer"
开工日期是指承包商接到工程师根据本合同发出开工通知书的日期。
"Between three and five hundred workers to be discharged, then," began Wang Ho-fu, summing up, "Sunday overtime to be abolished;
“开除工人,三百到五百; 取消星期日加工;
The recurrence start date doesn't correspond to the recurrence pattern. Change the recurrence start date from a weekend day to a weekday.
重复周期的开始日期不符合定期模式。将重复周期的开始日期从周末更改为工作日。
Japan’s Short-term Objective in Developing New Wood Processing Technology;
日本木材工业新技术开发的近期目标
The said Effective Date shall be construed as the date of the commencement of work hereunder.
上述生效日期即为本协议规定的开始工作之日。
No efforts will be spared to complete the preparatory work for the south-to-north water diversion project, in order to start the project as quickly as possible.
抓紧“南水北调”的前期工作,力争早日开工建设。
Work on Mongolia People Done by the CPC during the Anti-Japanese War;
抗日战争时期中国共产党开展的蒙古民族工作
Receive Location '{0}' has Start Date later than the Stop Date. Change either the Start Date or the Stop Date.
接收位置“{0}”的开始日期晚于停止日期。请更改开始日期或停止日期。
"Eh? Go on half time?"
“哦,哦,开半日工么?
The Employee shall work on probation for a period of forty (40) days, starting from the first workday.
雇员开始为雇主工作日起之初期四十天为试用期间。
Gantt Chart report: Name, Start Date, End Date, Duration, User-defined Number, Percent Complete -grouped by Resource
甘特图报告:名称、开始日期、结束日期、工期、用户定义的数字、完成百分比-按资源分组
The date range fixed from date is after the to date
日期范围的固定开始日期晚于完成日期
We'll bring the date of the meeting forward from the 20th to the 18th.
我们要把开会日期从20日提前到18日。
The date of the meeting was advanced from the 10th to the 3rd of June.
开会日期从6月10日提前到6月3日。
The date of the meeting was advanced from the 1 0 th to the 3 rd of June .
开会日期从六月十日提前到六月三日。
The Timeline finish date must be later than the start date.
时间线完成日期必须在开始日期之后。
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号