Through the fitting of coincidence points of GPS and leveling height,the partial geoid model is established.
本文以荔波水电项目为例,论述了水电工程中GPS控制网的布设、观测及数据处理的步骤,并详细地分析了GPS控制网的精度;通过测定公共点的GPS高程和几何水准高程,建立局部似大地水准面模型的方法,将GPS高程转换正常高,获得了满足工程精度要求的高程测量结果。
0,which is used for transferring the GPS geoid height by the leveling height and leveling height difference observations,and the integral frame and main function of sof.
0开发了一套比较实用的GPS高程转换软件包GPSH(global positioning system height transformation),该软件可利用水准高程和水准高差观测值进行GPS高程转换,并给出了软件的整体框架和主要功能。
Discussion on some key-links in owner s management of construction of pumped storage hydropower station;
浅谈抽水蓄能工程建设业主管理的关键问题
Project Auditing of Jiangsu Yixing Pumped Storage Power Station
江苏宜兴抽水蓄能电站工程项目审计
Supervision on the Underground Project and Lower Reservoir of Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站地下工程及下水库工程监理
Project Quality Supervision Research for Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站工程质量监督工作探索
Review on the Safety Work of Jiangsu Yixing Pumped Storage Power Station Project
江苏宜兴抽水蓄能电站工程安全工作回顾
Study on Experiment Fiber Concrete of Tai an Pumped Storage Project;
泰安抽水蓄能电站工程纤维混凝土试验研究
Investment control during construction phase of Baishan Pumped Storage Hydropower Station;
白山抽水蓄能电站工程实施阶段投资控制
Management and control of project investment in Shahe Pumped-storage Power Plant;
沙河抽水蓄能电站工程投资管理与控制
Ground-stress Testing Result Application of Huizhou Pumped Storage Power Station
惠州抽水蓄能电站工程地应力测试成果应用
Application of "Four-New Technology" to Jiangsu Yixing Pumped Storage Power Station Project
江苏宜兴抽水蓄能电站工程“四新技术”的应用
Research on Interim Process in Condition of Water-pumping Power Failure under Low Head in Bailianhe Pumped-storage Power Station
白莲河抽水蓄能电站首台机组低扬程下水泵工况抽水断电水力过渡过程研究
Reseach on the Influence of the Xiangshuijian Pumping Water and Storing Energy Power Station on the Animal;
响水涧抽水蓄能电站工程对动物资源的影响研究
The Heightening Reinforcement Engineering Experience for the Lower Reservoir Dam of the Baoquan Pumped Storage Power Station in Henan Province
河南宝泉抽水蓄能电站下水库大坝加高加固的工程经验
Management of the Design and Construction Supervision of Jiangsu Yixing Pumped Storage Power Station
江苏宜兴抽水蓄能电站工程设计与施工监理管理
Safety and Environment Protection,Goal Realization to Put Into Generation,and Striving for the Achievement of the State-level Excellent of Project--The on-the-spot record of the construction of Baoquan Pumped Storage Power Station;
安全环保 达标投产 争创国优——宝泉抽水蓄能电站工程建设目标纪实
Successful Practice in Management Reform --An Analysis of Experiences with Guangzhou Pumped Storage Power Station;
工程管理改革的成功实践——广州抽水蓄能电站建设经验探讨
Engineering Characteristics of Dam-body Spillway of Rockfill Dam with Concrete Face Slab for the Tongbai Pumped Storage Power Station
桐柏抽水蓄能电站面板堆石坝坝身溢洪道工程特点
The Influence of the Pump Storage Unit State on Generator and Transformer Protection and Engineering Solution
抽水蓄能机组状态对发变组保护的影响及工程解决方案