The practice shows that it is effective to remedy the loss of bearing capacity due to sloping piles by reinforcing cracking sloping piles,foundation caps and ground board together,with considering of the cooperation of upper-level structure-pile cap and ground board pile-earth.
实践证明通过对断裂斜桩及基础承台、底板的整体加固,并考虑上部结构———承台、底板—桩—土的综合共同作用来弥补因斜桩而造成的承载力损失是行之有效的处理方法。
Treatment of fracture and deflection of division piers in forebay of Nanxihe draining pump station;
南溪河排涝泵站前池隔墩断裂偏斜的处理措施
This paper makes a synthetic mechanical analysis on the plunge pool flank wall,abutment wall broken failure by tilting and poses the reasonable reiforcing calculation to supply the theoretical and scientific warranty for the future hydrotechnical design.
对消力池侧墙、翼墙断裂倾斜破坏进行了综合性力学分析,提出了合理的配筋计算,为今后水工设计提供科学理论依据。