Analysis of Baroclinic Process and Diagnostic Research of a Rainstorm Case Occurring in North-China in Autumn;
一次华北秋季暴雨的斜压过程分析及诊断研究
Mechanism of crack interaction in hydraulic fracture of inclined wells
斜井水力压裂过程中的缝间干扰力学机理研究
FEATURES OF BAROTROPIC/BAROCLINIC VORTICITY AND ENSTROPHY DURING OKHOTSK BLOCKING DEVELOPMENT
鄂霍茨克海阻高发展过程的正斜压涡度和涡度拟能的演变特征
In drilling high angle deviated holes, friction is the main factor affecting the effective WOB.
在大斜度定向井钻井过程中,摩擦阻力是影响有效钻压的主要因素。
Nonlinear Finite Element Full-Range Analysis of Reinforced Concrete Panel and Wall Based on Modified Compression Field Theory;
基于修正斜压场理论的钢筋混凝土板、墙非线性有限元全过程分析
The Research of the Blocking Process Resulting from Interaction Tetween Barotropic and Baroclinic Enstrophy;
正、斜压涡度拟能相互作用所激发的阻塞过程研究
Diagnostic Analysis of the Heavy Rain Occurrence and Maintenance Dynamic Mechanisms by Coupling Forces between Dynamic and Thermodynamic Fields
斜压热动力耦合强迫在暴雨发生维持过程中的动力诊断分析
Cable Force Monitoring of Inclined Tower Cable-Stayed Bridge without Back-Stay in Constructing;
无背索斜塔斜拉桥施工过程中索力监控研究
Compression:The act or process of compressing.
压缩:压缩的过程或行为.
The act or process of compressing.
压缩压缩的过程或行为
Theory Research on Construction Control of Concrete Cable-Stayed Bridges
混凝土斜拉桥施工过程控制理论研究
R/D on Hydyo-Process and Separator of Settling in Tilting Narrow Upflow;
斜窄流沉降分离过程研究与设备研制
The Simulation and Analysis in Construction State of Cable-Stayed Bridge Based on ANSYS;
基于ANSYS的斜拉桥施工过程模拟分析
Analysis of the Long-span Hybrid Cable-stayed Bridge Through Construction Stage
大跨径混合梁斜拉桥施工全过程分析
The characteristics of the Lenggu-Zihe arc anticline and the formation process
楞古―孜河弧形背斜特征及形成过程
Monitoring on Stayed Cable Construction of Luoyang New District Stadium
洛阳新区体育场斜拉索施工过程监测
To lurch or swerve while in motion.
蹒跚而行在运动过程中突然侧倾或偏斜
study on step sidewall tilt in ion beam etching of Fresnel lens
离子束刻蚀过程中台阶侧壁倾斜现象研究
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号