Optimal design of power-assisted mechanism for ferry board based on ADAMS
基于ADAMS的渡板助力机构优化设计
Optimal design of power-assisted mechanism for ferry board based on ADAMS
基于ADAMS的渡板助力机构优化设计
Establishment of the Connecting Bridge's Length and Design of the Reconstructed Transition Board
客滚桥桥体长度确定及过渡板改造设计
How to Transform from "SMB Board" to "Operating Board";
“中小企业板”如何过渡到“创业板”
Horizontal intermediate cross rails, which are required for locks, will be recessed and concealed.
水平过渡交叉挡板应扣住,凹入并隐藏。
Construction of impervious wall in CFRD of Laodukou Hydropower Station
老渡口水电站面板堆石坝防渗墙施工
Dam Body Filling Design by Stages for Concrete Face Rock-fill Dam of Hongjiadu Hydropower Station
洪家渡水电站面板堆石坝坝体填筑分期设计
Application of impact roller compaction technology to Hongjiadu concrete face rockfill dam
冲碾压实技术在洪家渡面板堆石坝上的应用
The Investigation and Analysis of the Masses and Set Resettlement Board Room Facilities for People with Regard to Post-Earthquake Disaster Area
过渡安置板房及配套生活设施设计分析
Calculation of Flexural Strength for Vehicle Ferry Gangplank Girder through In uence Matrix
用影响线法计算汽车渡船跳板主梁的强度
The Influence of Slab Performance on Differential Settlement of Bridge-approach
路桥过渡段差异沉降对搭板性能的影响
Grillage Strength Calculation of 33 m Vehicle Ferries with a Heavy Load
33m汽车渡船运载大型容器时甲板板架的强度计算
For example, when our army was preparing to cross the Yellow River, the masses gave us their door planks. As the door planks in the Hebei-Shandong-Henan Area were not enough, the people in southern Hebei contributed theirs.
如渡黄河,群众把门板都贡献出来,光冀鲁豫的门板还不够,连冀南的门板也下下来了。
Study on Concrete Face Rockfill Dam Construction Diversion Standard and Flood Passing Measures During Construction Period;
混凝土面板堆石坝施工导流标准及施工期渡汛措施研究
Template Preparation and Friction Properties of Transitional Metal Disulfide Nanotubes
模板法制备过渡族金属硫化物纳米管及其摩擦学性能研究
Design of the Moulding Board and Concrete Pouring Technique for U-type Thin Shell Flume Without Symmetrical Lacing Wire Support
U型薄壳大渡槽无对拉筋支撑、模板设计及混凝土浇筑施工技术
Study on Design Requirements and Seepage Deformation Characteristics of Transition Zone Material for Shuibuya Concrete Face Rockfill Dam
水布垭面板堆石坝过渡料设计及其渗透变形特性研究
Cemented Rockfill Materials for Bedding and Transition Layers of High CFRD
改性堆石料作高面板堆石坝垫层和过渡层的探讨
Application of Non-removal Metal Mesh Formwork in Concrete Construction of Xiluodu Hydropower Station
免拆金属模板网在溪洛渡水电站混凝土中的应用
CopyRight © 2020-2024 优校网[www.youxiaow.com]版权所有 All Rights Reserved. ICP备案号:浙ICP备2024058711号